Welcome to zhongcai!

Whatsapp/Wechat/Tel: 8618922318676

Email: gdzcee@gmail.com

Horizontal Axis Wind Turbine Teaching Equipment Renewable Training System
Horizontal Axis Wind Turbine Teaching Equipment Renewable Training System

Horizontal Axis Wind Turbine Teaching Equipment Renewable Training System

We provide Horizontal Axis Wind Turbine Teaching Equipment Renewable Training System with great production line and offer fast delivery, professional team, effiective function, friendly service, technology support.

Brand Name: Zhongcai / ODM
FOB: Get Latest Price
MOQ: 1 Set
Lead Time: 15 ~ 30
Warranty: 1 Year
Certificate: ISO9001/ISO14001/CE
Application: Vocational Training For Electrical Trainer
Catalog: Automotive Education Equipment Catalog
Product Details

Electrical Trainer

Automotive Training Trainer

SR6126 Horizontal Axis Wind Turbine Teaching Equipment Renewable Training System

Specification
wind power plant for converting kinetic wind energy into electrical energy
movable wind power plant that can be set up outside
4 base supports for stabilisation
stand-alone operation with connection to ET 220 or ET 220.10
generator for converting kinetic energy into electrical energy
accumulator for storing the electrical energy
measurement of wind velocity
measurement of the rotational speed of the rotor
display of the measured data on the control unit of ET 220 or ET 220.10
Technical data
Rotor
Ø 1200mm
hub height above ground level: approx. 5000mm
Generator
max. output: 350W
voltage: 12VDC
max. charging current: 30A
Accumulator
voltage: 12VDC
capacity: 65Ah
Space requirement
LxWxH: 10x6x6m
max. distance from ET 220/ET 220.10: approx. 20m


Measuring ranges
wind velocity: 0,7…50m/s
speed: 0…3000min-1    
Standard number of blades: 6
3-phase generator and integrated DC rectifier 
Unit comes with a small mounting mast
installation at an elevated height. Alternatively block
can be mounted on a locally accessible mast or
optional student exam accessories
controller supplied and variable load for performance
investigation
The number of blades may vary for internal investigation.
Air speeds before
and after the turbine is measured in order to allow students to research overall performance
Mounting plug: approx. 500 mm long
External load up to 15A


 
 
 
Company Profile
Certifications
Product packaging
FAQ
Clear All